Baltic Projects

SW1 Full Refurbishment

Westminster

Description

The basement level was totally stripped out, central heating pipes re-laid in the concrete subfloor and a gas boiler fitted.

LED lights were installed, a bathroom was plumbed in and tiled, the utility area was converted into a kitchen and 2 sets of new hardwood French doors were made and hung.

One of the coal holes was utilised as the new utility area; new pipework and electrics supplied.

Finally the whole area was redecorated and timber floors fitted throughout.